Week 9 : Methodology

Image
Date : 25/04/2022 – 29/04/2022 Activity : Creating Block Diagram  Purpose :  To described in details the function between input and output variables. Procedure : Block diagram is a visual representation of a system or process that uses simplest blocks represent single or multiple items or even concepts by connecting lines by line in order to show the relationship between the process. As for this project, creating a block diagram just to shows the process of how the portable tracking system operates. Conclusion :

Week 8 : Methodology

Image
Date :  18/04/2022 – 22/04/2022 Activity : Creating Flowchart and Gantt Chart Purpose :  To justify the project flows or process.  To represent the timing of various task that required to complete a project. Procedure : During this week, I decided to finish several tasks on Chapter 3 that must be included in the proposal and slides. The Methodology section includes a flow chart, a Gantt chart, and a block diagram. The section will briefly explain the project process in tabulated format, and the section will also represent and justify the weekly activities completed in order to complete the project. The task will be displayed in accordance with the weeks. Conclusion :

Week 7 : Proposal Preparation

Image
  Date :  04/04/2022 – 08/04/2022 Activity :  Proposal Preparation Purpose : To identify the scopes and limitations of project. Procedure : The scopes and limitation is an important findings that are about to covered and focusing on throughout implementation of component for this project. The scopes and limitations that will be covered are as follows:  The mechanism is suitable for operating the tracking device over long and short distance. In order to decide the component to be used, few aspect should be taken into account such as the component capability whether it able to operates for both long and short distance. Before choosing the suitable component, another consideration should be focus on is the battery life performance. Mostly, projects or prototype consisting GPS locator plays a significant role in battery life depletion. GPS will reduce battery life by 13% when there is a good signal strength. When remote workers are in an area with poor signal strength, t...

Week 6 : Proposal Research

Date : 28/03/2022 – 01/04/2022 Activity :  Proposal Research  Purpose :  To enclose specify software and electronic components to be use. To roughly list the features of selected components. To listing the cost estimation for desired project.  Procedure : On this week, I have decided on to enclosed the specify software and electronic components that are suitable for my project. Thereby, a tabulated data consisting of summary of variety electronic component will be discuss in accordance to the main functionality or contribution of the components to project. In addition, a table of estimation cost will be provided as it is necessary and usually to authorize the project budget in order to avoid spending beyond our will.  LoRa Dragino LoRa Gateway Battery CR2477 Buzzer Push Button LED Arduino MCU Board Conclusion :